ÃËÀÂÍÀß ÍÀ ÂÎÎÐÓÆÅÍÈÈ ÏÅÐÑÏÅÊÒÈÂÍÛÅ
ÐÀÇÐÀÁÎÒÊÈ
ÎÃÍÅÂÀß ÌÎÙÜ
ÇÀÙÈÒÀ ÏÎÄÂÈÆÍÎÑÒÜ 

ÝÊÑÊËÞÇÈÂÍÛÅ ÌÀÒÅÐÈÀËÛ  ÁÈÁËÈÎÒÅÊÀ ÔÎÒÎÎÁÇÎÐÛ
 


 

M1E1 TANK PROGRAM

FACTORS INFLUENCING CHANGES

SOVIET 125MM GUN/AMMO

INCREASED ARMOR PROTECTION

RECOGNITION OF SOVIET NBC THREAT


 

 

 

 

M1E1

IMPROVED FIREPOWER

120MM GUN

IMPROVED ARMOR

NUCLEAR, BIOLOGICAL, CHEMICAL (NBC) PROTECTION

HYBRID NBC SYSTEM

MICRO-COOLING FOR CREW

WEIGHT REDUCTION

 

HRONOLOGY

• SEC ARMY 120MM GUN DECISION   JAN 78

(AUG 84 PRODUCTION)

120MM SPECIAL ASARC  APR    78

120MM LICENSE    FEB    79

PROGRAM INITIATED     MAR   79

INTERIM VCSA BLOCK IMPROVEMENT        MAR   81

APPROVAL (AUG 85 PRODUCTION)

USER REQUIREMENT FOR CREW COOLING            JUL     81

VCSA DECISION

SEP 81

APPROVED BIP

M1E1 = 120MM GUN + BIP

(AUG 85 PRODUCTION)


 

 

 

 

M1E1 AMMUNITION STOWAGE

ISSUE: 120MM AMMO FRAGILITY NECESSITATES SPECIAL VEHICLE RACK DESIGN

STATUS:

  • M1E1 RACKS FAILS AMMO ROBUSTNESS TEST (AUG 82)
  • ALTERNATE DEVELOPMENT SOURCE SEARCH (SEPT-OCT 82)
  • 4 CONTRACTOR CONCEPT COMPETITION (NOV 82-JAN 83)
  • GEN.DYNAMICS LAND SYSTEMS DIV
  • FMC NORTHERN ORDNANCE DIV
  • WEGMANN, KASSEL, GERMANY
  • GEN. DYNAMICS POMONA DIV
  • DESIGN-CONTRACTOR SELECTION (FEB 83)
  • WILL MEET DEVELOPMENT & PRODUCTION SCHEDULE

 

 


 

 

 

 


 

 

 

 

 

LOADER'S SEAT

PROBLEM-LOCATION/DOOR FOR SOME PERSONNEL

FIX ALTERNATIVES

DEVELOP VARIABLE LOCATION SEAT (SKATE MOUNT)

• TENTATIVE PLAN

EVALUATE CONCEPT-TEST IN EDT-C/PQT-C

HAVE FIX FOR PQT-G

 


 

 

120 MM GUN AUXILIARY IMPACTS

ISOLATED AMMO RACKS

STUB CASE DEFLECTOR

STUB CASE CONTAINER

RELOCATED LOADER'S HARDWARE

CREW GUARDS

BUSTLE DOOR MECHANICAL LINKAGE

RAISED BUSTLE ROOF

 

M1E1 TANK PROGRAM

BLOCK IMPROVEMENTS

IMPROVED ARMOR

NBC COLLECTIVE PROTECTION

CREW COOLING

WEIGHT REDUCTION

 

 

 

ARMOR MODIFICATION

DEFEATS THREAT

EXTENDED TURRET FRONT AND GUN SHIELD

WEIGHT INCREASE 1.0 TON

INTRODUCE IN DECEMBER 1984


 

 

HYBRID NBC

COLLECTIVE PROTECTION

OVERPRESSURE SYSTEM

CREW COOLING

AUTOMATIC CHEMICAL AGENT DETECTOR

 

CURRENT PROTECTION

VENTILATED FACE PIECE

M13A1 FILTER BLOWER UNIT

M25A1 MASK

M256 CHEMICAL AGENT DETECTOR KIT

ABC-M-11, DS2, PORTABLE DECONTAMINATING APPARATUS (3 PER VEHICLE)

AN/VDR-1 RADIAC

I

 

NBC CREW PROTECTION

INTEGRATED NBC/MICRO-COOLING SYSTEM

HULL INSTALLATION

• 2 FILTERS; 200 CFM

• BLEED AIR TAPPED OFF AGT - 1500 TURBINE

DUAL AIR HEATER

 

 

 

 


 

TRANSMISSION/FINAL DRIVE

IMPROVEMENTS

TORQUE CONVERTER THRUST BEARING

INCREASED CAPACITY (ADD C4 FRICTION PLATE)

LOWER LOCK-UP SHIFT POINTS

ONE PIECE CONTROL PLATE

CLUTCH/BRAKE LUBE DISTRIBUTION

IMPROVED FILTRATION SYSTEM

TANDEM/VARIABLE DISPLACEMENT PUMP

IMPROVED FINAL DRIVE

THRUST CAPACITY

BETTER DISCONNECT SYSTEM

IMPROVED SEALING

 

 

 

 

 

 

DT/OT II OBJECTIVES

DEMONSTRATE M1E1 MEETS OR EXCEEDS REQUIREMENTS OF MN AND SYSTEM SPEC

COMPARE PERFORMANCE WITH M1 TANK RELATIVE TO SURVIVABILITY, FIREPOWER, MOBILITY, AND FIGHTABILITY

DETERMINE RAM-D AND COMPARE WITH M1 TANK

COMPARE OVERALL OPERATIONAL EFFECTIVENESS WITH M1 TANK


 

 

 

 

 

 

 

BLOCK II IMPROVEMENTS HARDWARE PLANS

IMPROVED COMMANDERS STATION

REVISED CONCEPT COMMANDERS WEAPON

REVISE CDR'S HATCH & VISION BLOCKS FOR MAX VISION

INTEGRAL THERMAL IMAGING

CMD & CONTROL DATA STORAGE & PRESENTATION

DRIVERS THERMAL IMAGING SYSTEM

DIRECT VIEW PERISCOPE

REMOTE VIEW VIDEO

CO2 LASER RANGEFINDER INTEGRATION

ENHANCED SMOKE DISPENSING CAPABILITY

FAST REFUEL CAPABILITY

 





 
ÃËÀÂÍÀß ÍÀ ÂÎÎÐÓÆÅÍÈÈ ÏÅÐÑÏÅÊÒÈÂÍÛÅ
ÐÀÇÐÀÁÎÒÊÈ
ÎÃÍÅÂÀß ÌÎÙÜ
ÇÀÙÈÒÀ ÏÎÄÂÈÆÍÎÑÒÜ 

ÝÊÑÊËÞÇÈÂÍÛÅ ÌÀÒÅÐÈÀËÛ  ÁÈÁËÈÎÒÅÊÀ ÔÎÒÎÎÁÇÎÐÛ